** Incoming! v3 Revisions are on the way! **
MTBB:
In response to your feedback, we will be providing the following clarification: Implementation language update to clarify that the survey and response rate only needs to account for base building occupants.
Please note, the below requirements and compliance documentation will be updated soon to reflect v3 changes. You can find more information on these revisions in a Change Log that will be available on the Help Center on December 10, 2024. ________________________________________________________________________
Occupant Satisfaction Survey
Conduct an occupant satisfaction survey for all occupants
Rationale: Regularly fielding an occupant satisfaction survey and ensuring a sufficient response rate provides insight into occupant perceptions of site design and operations, which highlights opportunities to improve features and programs to support mental, physical, and social health.
For the most accurate strategy and documentation requirements, please refer to the digital scorecard made available on the Fitwel Platform.
Requirements
Demonstrate compliance with one of the options below:
Option 1 - Occupant Satisfaction Survey (Full Credit):
To achieve full credit, demonstrate compliance with all of the following requirements:
Multi-Tenant Whole Building (no on-site management), Multi-Tenant Whole Building (with on-site management)
- The occupant satisfaction survey is fielded annually.
- The occupant satisfaction survey includes a summary of a minimum of four of the following categories:
- commuter infrastructure
- programming
- building access
- outdoor spaces
- shared spaces
- workplaces
- food access.
- Meets the response rate below based on the number of total building occupants:
- for buildings with 1 - 1,000 occupants, a 30% response rate
- for buildings with 1,001 - 2,000 occupants, a 25% response rate
- for buildings with 2,001- 3,500 occupants, a 20% response rate
- for buildings with 3,501 - 5,000 occupants, a 15% response rate
- for buildings with 5,001 - 10,000 occupants, a 10% response rate
- for buildings with over 10,000 occupants, the required response rate decreases by 1% for every additional 1,000 occupants to a minimum of 5%.
Single-Tenant, Commercial Interior
- The occupant satisfaction survey is fielded annually.
- The occupant satisfaction survey includes a summary of a minimum of four of the following categories:
- commuter infrastructure
- programming
- building access
- outdoor spaces
- shared spaces
- workplaces
- food access.
- Meets the response rate below based on the number of full- and part-time employees and staff within tenant spaces:
- for 1 - 1,000 full- and part-time employees and staff, a 30% response rate
- for 1,001 - 2,000 full- and part-time employees and staff, a 25% response rate
- for 2,001- 3500 full- and part-time employees and staff, a 20% response rate
- for 3,501 - 5,000 full- and part-time employees and staff, a 15% response rate
- for 5,001 - 10,000 full- and part-time employees and staff, a 10% response rate
- for over 10,000 full- and part-time employees and staff, the required response rate decreases by 1% for every additional 1,000 occupants to a minimum of 5%.
Option 2 - Occupant Satisfaction Survey for Building Management Only (Partial Credit):
The project may achieve partial credit by demonstrating compliance with all of the following requirements:
Multi-Tenant Whole Building (with on-site management)
- The occupant satisfaction survey is fielded annually.
- The occupant satisfaction survey includes a summary of a minimum of four of the following categories:
- commuter infrastructure
- programming
- building access
- outdoor spaces
- shared spaces
- workplaces
- food access.
- Meets the response rate below based on the number of on-site full- and part-time employees and staff within building owner/management spaces only:
- for buildings with 1 - 1,000 on-site full- and part-time building management employees and staff, a 30% response rate
- for buildings with 1,001 - 2,000 on-site full- and part-time building management employees and staff, a 25% response rate
- for buildings with 2,001- 3,500 on-site full- and part-time building management employees and staff, a 20% response rate
- for buildings with 3,501 - 5,000 on-site full- and part-time building management employees and staff, a 15% response rate
- for buildings with 5,001 - 10,000 on-site full- and part-time building management employees and staff, a 10% response rate
- for buildings with over 10,000 on-site full- and part-time building management employees and staff, the required response rate decreases by 1% for every additional 1,000 occupants to a minimum of 5%.
Compliance Documentation
Design Pathway
Option 1:
- Checkbox to certify that the occupant satisfaction survey will be fielded annually
- Checkbox to certify that the occupant satisfaction survey will include a detailed summary detailing a minimum of four of the following:
- commuter infrastructure
- programming
- building access
- outdoor spaces
- shared spaces
- workplaces
- food access
- Upload a copy of the occupant satisfaction survey that will be fielded
- Checkbox to certify that the occupant satisfaction survey will meet the required response rate based on the number of occupants within the building
- Checkbox to certify that interventions related to the occupant satisfaction survey results will be implemented annually
Option 2:
- Checkbox to certify that the occupant satisfaction survey will be fielded annually
- Checkbox to certify that the occupant satisfaction survey will include a detailed summary detailing a minimum of four of the following:
- commuter infrastructure
- programming
- building access
- outdoor spaces
- shared spaces
- workplaces
- food access
- Upload a copy of the occupant satisfaction survey that will be fielded
- Checkbox to certify that the occupant satisfaction survey will meet the required response rate based on the number of full- and part-time employees and staff within building owner/management spaces
Built Pathway
Option 1:
- Checkbox to certify that the occupant satisfaction survey is fielded annually
- Checkbox to certify that the occupant satisfaction survey includes a detailed summary detailing a minimum of four of the following:
- commuter infrastructure
- programming
- building access
- outdoor spaces
- shared spaces
- workplaces
- food access
- Upload a copy of the occupant satisfaction survey detailing the results for the selected categories
- Text box to input the number of building occupants
- Text box to input the number of survey responses that were received
- Checkbox to certify that interventions related to the occupant satisfaction survey results will be implemented annually
- Upload a description of the most recent intervention implemented based on the occupant satisfaction survey results
Option 2:
- Checkbox to certify that the occupant satisfaction survey is fielded annually
- Checkbox to certify that the occupant satisfaction survey includes a detailed summary detailing a minimum of four of the following:
- commuter infrastructure
- programming
- building access
- outdoor spaces
- shared spaces
- workplaces
- food access
- Upload a copy of the occupant satisfaction survey detailing the results for the selected categories
- Text box to input the number of full- and part-time employees and staff within building owner/management spaces
- Text box to input the number of survey responses that were received
Comments
0 comments
Article is closed for comments.