Provide access to a bicycle share system.
Rationale: Bicycle share programs support increased convenience for cyclists, promote increased active transportation, contribute to increased physical activity, reduce congestion, and improved air quality.
Requirements
For the most accurate strategy and documentation requirements, please refer to the digital scorecard made available on the Fitwel Platform.
Requirement Guidance: Bicycle stations may be shared across more than one building. A combination of bicycle shares that meet the requirements may qualify for the strategy.
For buildings with multiple entrances, identify a main building entrance that is used to access a common area within the building such as a lobby, reception area, or main circulation pathway. |
Demonstrate compliance with one of the options below:
Option 1 - Bicycle Share Access (Full Credit):
To achieve full credit, demonstrate compliance with all of the following requirements:
- Provide access to a bicycle share station or dockless bicycle hub located within a 1/2-mile or 800-meter walking route of a main building entrance(s) of 51% of all regularly occupied buildings within the project.
- Publicize the identified bicycle share station to all occupants within the project through one of the following:
-
- a digital platform, such as a website, digital application, or display screen in common areas
- annual communication material, such as notification emails or newsletters
-
Option 2 - Shared Bicycles (Partial Credit):
To achieve partial credit, demonstrate compliance with all of the following requirements:
- Provide access to shared bicycles and related equipment (such as helmets and bicycle locks) within the project.
- Ensure shared bicycles and related equipment are accessible to all project occupants.
- Publicize the identified shared bicycles and related equipment to all occupants within the project through one of the following:
-
- a digital platform, such as a website, digital application, or display screen in common areas
- annual communication material, such as notification emails or newsletters
-
Compliance Documentation
Design Pathway
Option 1 - Bicycle Share Access (Full Credit):
Requirement 1
- Upload an annotated map or plan identifying the distance from 51% of all regularly occupied buildings.
- Upload annotated design drawings or a photograph(s) showing the planned bicycle share station.
Requirement 2
- Checkboxes to certify that identified bicycle share station will be publicized through the following methods (select all that apply):
- a digital platform, such as a website, digital application, or display screen in common areas
- annual communication material, such as notification emails or newsletters
Option 2 - Shared Bicycles (Partial Credit):
Requirement 1
- Upload annotated design drawings or a photograph(s) showing the shared bicycles and related equipment that will be included.
- Upload an annotated plan identifying the planned location of the shared bicycles and related equipment that will be provided within the project.
Requirement 2
- Checkbox to certify that the shared bicycles and equipment will be accessible to all project occupants.
Requirement 3
- Checkboxes to certify that the identified shared bicycles and related equipment will be publicized through the following methods (select all that apply):
- a digital platform, such as a website, digital application, or display screen in common areas
- annual communication material, such as notification emails or newsletters
Built Pathway
Option 1 - Bicycle Share Access (Full Credit):
Requirement 1
- Upload an annotated map or plan identifying the distance from 51% of all regularly occupied buildings.
- Upload an annotated photograph(s) showing the bicycle share station.
Requirement 2
- Checkboxes to certify that identified bicycle share station is publicized through the following methods (select all that apply):
- a digital platform, such as a website, digital application, or display screen in common areas
- annual communication material, such as notification emails or newsletters
- Upload a copy of the materials that are shared.
Option 2 - Shared Bicycles (Partial Credit):
Requirement 1
- Upload annotated design drawings or a photograph(s) showing the shared bicycles and related equipment that will be included.
- Upload an annotated plan identifying the planned location of the shared bicycles and related equipment that will be provided within the project.
Requirement 2
- Checkbox to certify that the shared bicycles and equipment are accessible to all project occupants.
Requirement 3
- Checkboxes to certify that the identified shared bicycles and related equipment is publicized through the following methods (select all that apply):
- a digital platform, such as a website, digital application, or display screen in common areas
- annual communication material, such as notification emails or newsletters
- Upload a copy of the materials that are shared.
Comments
0 comments