Implement stormwater management practices
Rationale: Implementing practices to manage the quality and quantity of stormwater runoff prevents pollution, erosion, and flooding, mitigating risk of injury, infection and illness from contaminated drinking water; stormwater management also prevents biodiversity loss, which supports exposure to diverse microbiota, contributing to a strengthened immune system.
For the most accurate strategy and documentation requirements, please refer to the digital scorecard made available on the Fitwel Platform.
Requirements
Demonstrate compliance with the below:
Stormwater Management Plan (Full Credit):
To achieve full credit, demonstrate compliance with all of the following requirements:
Multi-Tenant Whole Building (no on-site management), Multi-Tenant Whole Building (with on-site management), Multi-Tenant Base Building, Single Tenant
- Provide a minimum of one qualifying stormwater infrastructure element.
-
- Qualifying stormwater infrastructure elements may include but are not limited to the following:
-
- retention ponds
- permeable pavement
- green roofs
- blue roofs
- rain gardens
- bioswales
- cisterns.
-
- Qualifying stormwater infrastructure elements may include but are not limited to the following:
-
- Ensure that the stormwater infrastructure manages all of the following, as applicable:
- controls stormwater runoff
- treats stormwater runoff from the site prior to entering local water sources
- treats stormwater separately from sewer water
- protect areas where chemicals and hazardous waste are stored during high precipitation events
- prevents oil, gas, and grease from entering sewer outflow and stormwater runoff.
Compliance Documentation
Design Pathway
MTWB, MTWB+, MTBB, ST
Requirement 1
- Upload an annotated plan(s) detailing the planned location of the qualifying stormwater management infrastructure that will be implemented within the project
Requirement 2
- Upload design drawings detailing how the provided stormwater infrastructure will manage all of the listed requirements.
Built Pathway
MTWB, MTWB+, MTBB, ST
Requirement 1
- Upload an annotated plan(s) detailing the location of the qualifying stormwater management infrastructure that is implemented within the project.
- Upload annotated photographs showing each unique piece of stormwater infrastructure.
Requirement 2
- Upload design drawings or photographs detailing how the provided stormwater infrastructure manages all of the listed requirements.