Establish and implement a chemical purchasing policy
Rationale: A chemical purchasing policy can ensure that materials brought into the building will conform to standards that preserve high Indoor Air Quality (IAQ), contributing to enhanced respiratory and mental health.
For the most accurate strategy and documentation requirements, please refer to the digital scorecard made available on the Fitwel Platform.
Requirements
Demonstrate compliance with the below:
Chemical Purchasing Policy (Full Credit):
Demonstrate compliance with all of the following requirements:
- Establish and implement a chemical purchasing policy that is at a minimum as rigorous as the Fitwel Chemical Purchasing Policy.
The Fitwel Chemical Purchasing Policy can be found here.
- Ensure the policy applies to all chemical products and materials used and purchased within the building by the building owner or management.
- Ensure that all chemical products and materials procured and used within the building meet the product standards requirements of Section 2 of the Chemical Purchasing Policy.
- Implement an inventory and purchasing plan for all chemical products and materials that meets the requirements of Section 3 of the Chemical Purchasing Policy.
- Ensure that materials transparency information is accessible and shared with all occupants as outlined in Section 4 of the Chemical Purchasing Policy.
Compliance Documentation
Design Pathway
- Requirement 1
- Upload the chemical purchasing policy that will be implemented
- Requirement 2
- Checkbox to certify that the implemented policy will apply to all purchases made by the building owner or management within the building
- Requirement 3
- Checkbox to certify that all chemical products and materials procured and used within the building will meet the product standards requirements of Section 2 of the Chemical Purchasing Policy
- Requirement 4
- Checkbox to certify that an inventory and purchasing plan for all chemical products and materials that meets the requirements of Section 3 of the Chemical Purchasing Policy will be implemented
- Requirement 5
- Checkbox to certify that materials transparency information as outlined in Section 4 of the Chemical Purchasing Policy will be accessible to and shared with all occupants
Built Pathway
- Requirement 1
- Upload the chemical purchasing policy that is implemented
- Requirement 2
- Checkbox to certify that the implemented policy applies to all purchases made by the building owner or management within the building
- Requirement 3
- Checkbox to certify that all chemical products and materials procured and used within the building meet the product standards requirements of Section 2 of the Chemical Purchasing Policy
- Requirement 4
- Checkbox to certify that an inventory and purchasing plan for all chemical products and materials that meets the requirements of Section 3 of the Chemical Purchasing Policy is implemented
- Requirement 5
- Checkbox to certify that materials transparency information as outlined in Section 4 of the Chemical Purchasing Policy is accessible to and shared with all occupants
Comments
0 comments
Article is closed for comments.