Confirm that lead has been properly abated and control measures are implemented
Rationale: Lead control measures protect occupants from toxic effects of lead exposure and lead poisoning which can include cardiovascular disease, cognitive impairments, nervous system impairments, kidney disease, and behavioral issues.
For the most accurate strategy and documentation requirements, please refer to the digital scorecard made available on the Fitwel Platform.
Requirements
Demonstrate compliance with one of the options below:
Option 1 - Lead Control Measures (Full Credit):
Demonstrate compliance with all the following requirements:
- Implement lead control measures throughout the building(s) that include one of the following:
- removal
- encapsulation
- enclosure
- repair
- clean up.
- Ensure that the identified control measures are performed by a certified professional.
- Confirm that the identified control measures are required for future renovations within the building.
- Confirm that the control measures are implemented in all areas of the building.
Option 2 - Lead-Free Construction (Full Credit):
Demonstrate compliance with the following:
- Ensure that the building(s) construction began or will begin after the use of lead and lead-containing paint in construction products was banned in the country or region where building is located.
Compliance Documentation
Design Pathway
Option 1:
- Requirement 1
-
Upload legal documentation (such as a certificate or remediation report submitted to authorities) showing the lead control measure that have been or will be implemented within the building(s).
- Checkbox to confirm that the building(s) is in compliance with the lead control measures.
-
Checkbox to certify that at least one of the listed lead control measures were or will be implemented
-
- Requirement 2
- Checkbox to certify that the identified control measures have been or will be performed by a certified professional
- Requirement 3
- Checkbox to certify that the identified control measures are required for future renovations within the building(s)
- Requirement 4
- Checkbox to certify that the control measures are or will be implemented in all areas of the building(s)
Option 2:
- Input the year construction for the building(s) began
- Input the year in which lead and lead-containing paint in construction products was banned within the local jurisdiction
- Upload legal documentation (such as a certificate or reports submitted to authorities) demonstrating the date that construction on the building began or will begin
Built Pathway
Option 1:
- Requirement 1
-
Upload legal documentation (such as a certificate or remediation report submitted to authorities) showing the lead control measure that has been implemented within the building(s).
- Checkbox to confirm that the building(s) is in compliance with the lead control measures.
-
Checkbox to certify that at least one of the listed lead control measures were or will be implemented
-
- Requirement 2
- Checkbox to certify that the identified control measures are performed by a certified professional
- Requirement 3
- Checkbox to certify that the identified control measures are required for future renovations within the building(s)
- Requirement 4
- Checkbox to certify that the control measures are or will be implemented in all areas of the building(s)
Option 2:
- Input the year construction for the building(s) began
- Input the year in which lead and lead-containing paint in construction products was banned within the local jurisdiction
- Upload legal documentation (such as a certificate or reports submitted to authorities) demonstrating the date that construction on the building began