Confirm that lead has been properly abated and control measures are implemented
Rationale: Lead control measures protect occupants from toxic effects of lead exposure and lead poisoning which can include cardiovascular disease, cognitive impairments, nervous system impairments, kidney disease, and behavioral issues.
For the most accurate strategy and documentation requirements, please refer to the digital scorecard made available on the Fitwel Platform.
Requirements
Demonstrate compliance with one of the options below:
Option 1 - Lead Control Measures (Full Credit):
Demonstrate compliance with all the following requirements:
- Implement lead control measures that include one of the following:
- removal
- encapsulation
- enclosure
- repair
- clean up.
- Ensure that the identified control measures are performed by a certified professional.
- Confirm that the identified control measures are required for future renovations within the building.
- Confirm that the control measures are implemented in all areas of the building.
Option 2 - Lead-Free Construction (Full Credit):
Demonstrate compliance with the following:
- Confirm that the building construction or renovation was completed after the use of lead in construction was banned in the country or region where the building is located.
Compliance Documentation
Design Pathway
Option 1:
- Requirement 1
-
Upload the official report showing the lead control measure that have been or will be implemented
-
Checkbox to certify that at least one of the listed lead control measures were or will be implemented
-
- Requirement 2
- Checkbox to certify that the identified control measures have been or will be performed by a certified professional
- Requirement 3
- Checkbox to certify that the identified control measures are or will be required for future renovations within the building
- Requirement 4
- Checkbox to certify that the control measures are or will be implemented in all areas of the building
Option 2:
- Input the date the building was constructed
- Input the date in which lead was banned within the local jurisdiction
Built Pathway
Option 1:
- Requirement 1
-
Upload the official report showing the lead control measure that was implemented
-
Checkbox to certify that at least one of the listed lead control measures was implemented
-
- Requirement 2
- Checkbox to certify that the identified control measures are performed by a certified professional
- Requirement 3
- Checkbox to certify that the identified control measures are required for future renovations within the building
- Requirement 4
- Checkbox to certify that the control measures are implemented in all areas of the building
Option 2:
- Text box to input the date the building was constructed
- Text box to input the date in which lead was banned within the local jurisdiction
Comments
0 comments
Article is closed for comments.