Provide occupants access to a fresh produce vendor
Rationale: Vendors that prioritize the selling of fresh produce and operate on a regular schedule increase access to fruits and vegetables, encourage increased consumption of fruits and vegetables, and enhance community engagement — contributing to a diminished risk of diet-related diseases and social isolation.
Requirements
Demonstrate compliance with the below:
Accessible Produce Vendor (Full Credit):
Demonstrate compliance with all the following requirements:
Multi-Tenant Retail
- Identify a produce vendor that is accessible to all building(s) occupants.
- Ensure the identified produce vendor meets all of the following required operational requirements
-
-
- scheduled to operate during workplace work hours
- operational a minimum of one day a week
- operational for five months of the year or for the maximum growing season of the region.
-
- Ensure the identified vendor is located within a 1/2-mile or 800-meter walking route of a main building(s) entrance.
- Confirm that the identified produce vendor sells fresh produce.
Retail
- Identify a produce vendor that is accessible to all occupants within the project.
- Ensure the identified produce vendor meets all of the following required operational requirements:
-
-
- scheduled to operate during workplace work hours
- operational a minimum of one day a week
- operational for five months of the year or for the maximum growing season of the region.
-
3. Ensure the identified vendor is located within a 1/2-mile or 800-meter walking route of a main building entrance.
4. Confirm that the identified produce vendor sells fresh produce.
Compliance Documentation
Design Pathway
Requirement 1
MTR
- Checkbox to certify that the produce vendor will be accessible to all building(s) occupants.
RT
- Checkbox to certify that the produce vendor will be accessible to all occupants within the project.
Requirement 2
MTR, RT
- Upload the anticipated schedule of the produce vendor.
Requirement 3
MTR, RT
- Upload an annotated map identifying the planned distance between the vendor and a main building(s) entrance.
Requirement 4
MTR, RT
- Upload a description of the types of produce that will be sold by the vendor.
Built Pathway
Requirement 1
MTR
- Checkbox to certify that the produce vendor is accessible to all building(s) occupants.
RT
- Checkbox to certify that the produce vendor is accessible to all occupants within the project.
Requirement 2
MTR, RT
- Upload the schedule of the produce vendor.
Requirement 3
MTR, RT
- Upload an annotated map identifying the distance between the vendor and a main building(s) entrance.
Requirement 4
MTR, RT
- Upload a description of the types of produce sold by the vendor
Comments
0 comments
Article is closed for comments.