Confirm that lead has been properly abated and control measures are implemented
Rationale: Lead control measures protect occupants from toxic effects of lead exposure and lead poisoning which can include cardiovascular disease, cognitive impairments, nervous system impairments, kidney disease, and behavioral issues.
Requirements
Demonstrate compliance with one of the options below:
Option 1 - Lead Control Measures (Full Credit):
Demonstrate compliance with all the following requirements:
Multi-Tenant Retail
- Implement lead control measures that include one of the following:
- removal
- encapsulation
- enclosure
- repair
- clean up.
- Ensure that the identified control measures are performed by a certified professional.
- Confirm that the identified control measures are required for future renovations within the building.
- Confirm that the control measures are implemented in all areas of the building.
Retail
- Implement lead control measures that include one of the following:
- removal
- encapsulation
- enclosure
- repair
- clean up.
- Ensure that the identified control measures are performed by a certified professional.
- Confirm that the identified control measures are required for future renovations within the building.
- Confirm that the control measures are implemented in all areas of the building.
Option 2 - Lead-Free Construction (Full Credit):
Demonstrate compliance with the following:
Multi-Tenant Retail
- Confirm that the building construction or renovation was completed after the use of lead in construction was banned in the country or region where the building is located.
Retail
- Confirm that the building construction or renovation was completed after the use of lead in construction was banned in the country or region where the building is located.
Compliance Documentation
Types of compliance documentation required:
- Uploaded copy of materials
Comments
0 comments
Article is closed for comments.