Establish and implement a hazardous waste management plan
Rationale: A policy that addresses safe collection, storage, transportation, and disposal of common types of hazardous waste reduces toxic chemical exposure for immediate occupants and those who handle waste throughout the supply chain, which decreases the risk of associated neurological, respiratory, immune, and other disorders.
For the most accurate strategy and documentation requirements, please refer to the digital scorecard made available on the Fitwel Platform.
Requirements
Demonstrate compliance with the below:
Hazardous Waste Management Plan - (Full Credit):
To achieve full credit, demonstrate compliance with the following requirement:
Multi-Tenant Whole Building (no on-site management), Multi-Tenant Whole Building (with on-site management)
- Establish and implement a waste management plan that is at least as rigorous as the requirements of the Fitwel Waste Management Plan.
The Fitwel v3 Waste Management Policy can be found here.
- Ensure that the waste management plan applies to all waste within the building(s).
- Share the policy with tenants through either relevant leases or a tenant manual.
Multi-Tenant Base Building
- Establish and implement a waste management plan that is at least as rigorous as the requirements of the Fitwel Waste Management Plan.
The Fitwel v3 Waste Management Policy can be found here.
- Ensure that the waste management plan applies to all waste within the building(s).
- Share the policy with tenants through either relevant leases or a tenant manual.
Single-Tenant, Commercial Interior
- Establish and implement a waste management plan that is at least as rigorous as the requirements of the Fitwel Waste Management Plan.
The Fitwel v3 Waste Management Policy can be found here.
- Ensure that the waste management plan applies to all waste within the building(s).
Compliance Documentation
Design Pathway
MTWB, MTWB+
- Upload the draft plan
- Checkbox to certify the types of waste in addition to universal waste that will be generated by the project:
- Hazardous Chemical Waste (Sections 4-5 of plan)
- Biohazardous Waste (Sections 6-7 of plan)
- Only universal waste, no other applicable waste types
- Checkbox to certify that the waste management plan will apply to all waste within the building(s)
- Checkbox to certify that the policy will be shared with tenants
MTBB
- Upload the draft plan
- Checkbox to certify the types of waste in addition to universal waste that will be generated by the project:
- Hazardous Chemical Waste (Sections 4-5 of plan)
- Biohazardous Waste (Sections 6-7 of plan)
- Only universal waste, no other applicable waste types
- Checkbox to certify that the waste management plan will apply to all waste within the building(s)
- Checkbox to certify that the policy will be shared with tenants
ST, CI
- Upload the draft plan
- Checkbox to certify the types of waste in addition to universal waste that will be generated by the project:
- Hazardous Chemical Waste (Sections 4-5 of plan)
- Biohazardous Waste (Sections 6-7 of plan)
- Only universal waste, no other applicable waste types
- Checkbox to certify that the waste management plan will apply to all waste within the building(s)
Built Pathway
MTWB, MTWB+
- Upload the implemented plan
- Checkbox to certify the types of waste in addition to universal waste that is generated by the project:
- Hazardous Chemical Waste (Sections 4-5 of plan)
- Biohazardous Waste (Sections 6-7 of plan)
- Only universal waste, no other applicable waste types
- Checkbox to certify that the waste management plan applies to all waste within the building(s)
- Upload a copy of the materials that are shared
- Checkbox to certify that the policy is shared with tenants
MTBB
- Upload the implemented plan
- Checkbox to certify the types of waste in addition to universal waste that is generated by the project:
- Hazardous Chemical Waste (Sections 4-5 of plan)
- Biohazardous Waste (Sections 6-7 of plan)
- Only universal waste, no other applicable waste types
- Checkbox to certify that the waste management plan applies to all waste within the building(s)
- Upload a copy of the materials that are shared
- Checkbox to certify that the policy is shared with tenants
ST, CI
- Upload the implemented plan
- Checkbox to certify the types of waste in addition to universal waste that is generated by the project:
- Hazardous Chemical Waste (Sections 4-5 of plan)
- Biohazardous Waste (Sections 6-7 of plan)
- Only universal waste, no other applicable waste types
- Checkbox to certify that the waste management plan applies to all waste within the building(s)
Comments