** Incoming! v3 Revisions are on the way! **
MTBB: In response to your feedback, we will be providing the following clarification: Implementation language update to clarify that the amenities only need to account for base building occupants.
Please note, the below requirements and compliance documentation will be updated soon to reflect v3 changes. You can find more information on these revisions in a Change Log that will be available on the Help Center on December 10, 2024. ________________________________________________________________________
Provide access to a bicycle share system
Rationale: Bicycle share programs support increased convenience for cyclists, promote increased active transportation, contribute to increased physical activity, reduce congestion, and improved air quality.
For the most accurate strategy and documentation requirements, please refer to the digital scorecard made available on the Fitwel Platform.
Requirements
Requirement Guidance: Bicycle stations may be shared across more than one building. A combination of bicycle shares that meet the requirements may qualify for the strategy.
For buildings with multiple entrances, identify a main building entrance that is used to access a common area within the building such as a lobby, reception area, or main circulation pathway. |
Demonstrate compliance with one of the options below:
Option 1 - Bicycle Share Access (Full Credit):
To achieve full credit, demonstrate compliance with all of the following requirements:
Multi-Tenant Whole Building (no on-site management), Multi-Tenant Whole Building (with on-site management)
- Provide access to a bicycle share station or dockless bicycle hub located within a 1/2-mile or 800-meter walking route of a main building entrance(s).
- Publicize the identified bicycle share station to all building occupants through one of the following:
-
- a digital platform, such as a website, digital application, or display screen in common areas
- annual communication material, such as notification emails or newsletters
-
Single-Tenant, Commercial Interior
- Provide access to a bicycle share station or dockless bicycle hub located within a 1/2-mile or 800-meter walking route of a main building entrance(s).
- Publicize the identified bicycle share station to all full- and part-time employees and staff within tenant spaces through one of the following:
-
- a digital platform, such as a website, digital application, or display screen in common areas
- annual communication material, such as notification emails or newsletters
-
Option 2 - Shared Bicycles (Partial Credit):
To achieve partial credit, demonstrate compliance with all of the following requirements:
Multi-Tenant Whole Building (no on-site management), Multi-Tenant Whole Building (with on-site management)
- Provide access to shared bicycles and related equipment (such as helmets and bicycle locks) within the building.
- Publicize the identified shared bicycles and related equipment to all building occupants through one of the following:
-
- a digital platform, such as a website, digital application, or display screen in common areas
- annual communication material, such as notification emails or newsletters
-
Single-Tenant, Commercial Interior
- Provide access to shared bicycles and related equipment (such as helmets and bicycle locks) within the building.
- Publicize the identified shared bicycles and related equipment to all full- and part-time employees and staff within tenant spaces through one of the following:
-
- a digital platform, such as a website, digital application, or display screen in common areas
- annual communication material, such as notification emails or newsletters
-
Compliance Documentation
Design Pathway
Option 1:
- Requirement 1
- Upload an annotated map or plan showing the distance from a main building entrance to the station or hub
- Upload annotated design drawings or a photograph(s) showing the planned bicycle share station
- Requirement 2
- Checkbox to certify that identified bicycle share station will be publicized through one or more of the listed methods
Option 2:
- Requirement 1
- Upload an annotated design drawing(s) or photograph(s) showing the shared bicycles and related equipment that will be included
- Upload an annotated plan identifying the planned location of the shared bicycles and related equipment that will be provided within the building
- Requirement 2
- Checkbox to certify that the identified shared bicycles and related equipment will be publicized through one or more of the listed methods
Built Pathway
Option 1:
- Requirement 1
- Upload an annotated map or plan showing the distance from a main building entrance to the station or hub
- Upload an annotated photograph(s) showing the bicycle share station
- Requirement 2
- Checkbox to certify that identified bicycle share station is publicized through one or more of the listed methods
- Upload a copy of the materials that are shared
Option 2:
- Requirement 1
- Upload a photograph(s) showing the shared bicycles and related equipment
- Upload an annotated plan identifying the location of the shared bicycles and related equipment that are provided within the building
- Requirement 2
- Checkbox to certify that the identified shared bicycles and related equipment is publicized through one or more of the listed methods
- Upload a copy of the materials that are shared
- Requirement 3
- Checkbox to certify that the identified shared bicycles and related equipment is publicized through one or more of the listed methods
- Upload a copy of the materials that are shared
Comments
0 comments
Article is closed for comments.